How to Run a Project Detail Report

The Project Details Report gives you a per-project summary, key financial figures, phase status, and (optionally) a summary of time spent,  with each project starting on its own page. This article walks through building and running one.

Selecting Your Projects

As with all reports, start by getting the right projects in your found set. Run a query to pull the specific projects you want, or simply select them using the checkboxes in your project list. Once you have the projects you want, select Reports and choose Project Details.

Step 1: Project & Phases

The first step sets how your projects are sorted and how phase information is displayed:

  • Sort Projects By — choose the field to sort by (for example, Staff Primary), and whether it sorts ascending or descending. Sorting by primary staff is useful if you're planning to hand out individual reports to the people responsible for each project.
  • Phases Column Set — select which column set to use for the phases shown on the report. You can set up multiple column sets in advance and choose the one that fits.
  • Hide Phases with Statuses — a multi-select field letting you exclude phases by status. For example, if you don't want closed phases cluttering the report, select Closed here and those phases won't appear. You can select as many statuses as you want to hide.

Select Continue to move to the next step.

Step 2: Time Slips

This step lets you add a summary of time slip activity to the report:

  • Include Time Slips — toggle this on if you want time slip data included at all.
  • Date Range — set the start and end dates for the time slips you want summarized (for example, a single month, if you're reviewing effort for billing purposes).
  • Time Slips Column Set — a column set is required here; select the one you want to use (for example, Project Summary).
  • Primary Summary Field — this determines how the time is grouped. The report shows a summary, not an itemized list, so this field controls what that summary is organized by (for example, by Phase), along with ascending or descending order.
  • Sub-Summary Field — optional. Add a second level of grouping within the primary summary — for example, summarizing by billing rate or billing status within each phase.

Select Continue to move to the final step.

Step 3: Print

The last step covers the report's title and print formatting:

  • Title — the name that appears on the report.
  • Filename — the filename used when the report is saved or downloaded; defaults to a name based on the title and today's date.
  • Paper Size — for example, Letter.
  • Orientation — Portrait or Landscape.
  • Include Timestamp — adds the date and time the report was generated to the report header.
  • Include User — adds the name of the user who generated the report to the report header.

Once everything is set, select Run Report.

Reading the Report

The report builds with a page break between each project, so every project starts fresh on its own page — in most cases, a single project fits on one page. Each project's page includes:

  • The project's basic information and the "by the numbers" financial figures from the project's financial page.
  • A summary of its phases, based on the Phases Column Set and any hidden statuses you selected.
  • A summary of time slips (if included), grouped by your chosen Primary Summary Field and Sub-Summary Field.

A project with no activity in the selected date range will still show its by-the-numbers figures and phases, just with no time slips listed. As with all BaseBuilders reports, you can print the result or download it as a PDF.

Best Practice

Set up dedicated column sets ahead of time for the Phases and Time Slips sections of this report, rather than reusing a generic one — since the report summarizes rather than itemizes, the fields you choose directly determine how useful the grouped totals are. If you're planning to hand reports out to individual project managers, sort by Staff Primary so each person's projects are grouped together.

Summary

The Project Details Report is built in three steps: Project & Phases (sorting and phase column set, with the option to hide phases by status), Time Slips (an optional summarized — not itemized — view of time slip activity over a date range, grouped by a primary and optional sub-summary field), and Print (title, filename, and formatting options). The report runs with each project starting on a new page, showing the project's key financial figures, its phases, and its time slip summary, and can be printed or downloaded as a PDF.

Did this answer your question? Thanks for the feedback There was a problem submitting your feedback. Please try again later.

Still need help? Contact Us Contact Us